iSeek Data Centre

Client

iSeek

Location

Project Duration

28 weeks

Projects Size

6,000sqm

Status

FDC have completed the fitout of iSeek’s latest collocation data centre at Brisbane Airport.

This fitout was completed in the environmentally sensitive Brisbane Airport precinct and included all internal walls, ceilings and raised access floor throughout as well as the critical electrical, mechanical, fire, hydraulics, security and BMS services. The iSeek Data Centre totalled 3,380sqm. With an additional loading dock, the total site size was 6,000sqm.

These works also included the installation of the external chiller plant and standby generators. All critical equipment and services underwent five levels of commissioning to ensure reliability and performance.

Project Features

  • Uptime Institute Tier IV Design
  • Gas suppression system throughout technical areas
  • Air tight construction for fire suppression and cooling efficiency
  • High efficiency free-cooling system
  • Fire segregated technical spaces and equipment rooms